For engineering and EPC firms
P&C engineers and substation designers — billable in week one.
Your utility clients don't care that your billable engineering bench is short. We know the difference between a candidate who can ship a relay setting calc on day one and one who can't.
What you're likely dealing with
- Project award triggering a sudden P&C / design / drafting headcount need
- Existing senior engineers double-billed across utility, T&D, and renewables projects
- Travel-required roles losing candidates after the first week
- Contract-to-hire deals falling apart at conversion because of comp expectations
- New-grad designers ramping for 6 months before they're billable
What we deliver
- Direct-hire, contract, and contract-to-hire pipelines across P&C, design, drafting, PM, and coordination roles
- Pre-qualified on specific platforms — SEL, GE Multilin, ABB, Schweitzer, Easypower, ETAP, AutoCAD Electrical
- Candidates who understand a substation design package isn't just a single-line and a panel layout
- Honest travel-tolerance disclosure up front — no surprise quits in week 3
- Project-aware hiring: we ramp to your phase gates, not your hope-for-the-best timeline
Tell us about your project staffing need
No newsletter signup, no sales auto-sequence. The form below goes to a human and we follow up the same business day.